The Fustiñana plant is located in the municipality of Fustiñana (Navarra). Its installed capacity amounts to 2.4 MWp and is currently in operation under RD661/07. The electricity produced is connected to the local Iberdrola distribution grid.
PV Modules: SEM, Yocasol, Trina, Solom. Inverters : SMA. Technology: Double axis trackers. Annual Avoided Emissions : 8,197 Metric Tons CO2. Household Supply: 1,448 homes.
PPA System : FiT under Spanish RD661/207. System size : 2.4 MWp. Start construction date : July 2008. Commissioning date : July 2008. EPC Contractor : OPDE, S.A. O&M Provider : OPDE, S.A. Land: Hectares.